Whirlpool Dryer Machine | WPS D8 WBS EE | Energy efficiency class D | Front loading | 8 kg | Heat pump | Digital | Depth 55 cm |

536,07 €

WPS D8 WBS EE

8003437065002

Galimas pasirinkimas

 1..4 d.d.

Whirlpool Dryer Machine | WPS D8 WBS EE | Energy efficiency class D | Front loading | 8 kg | Heat pump | Digital | Depth 55 cm | White

Parašyti atsiliepimą